Skip to main navigation Skip to search Skip to main content

A hierarchical scheduling problem with a well-solvable second stage

    Research output: Contribution to Journal › Article › Academic › peer-review

    Abstract

    In the hierarchical scheduling model to be considered, the decision at the aggregate level to acquire a number of identical machines has to be based on probabilistic information about the jobs that have to be scheduled on these machines at the detailed level. The objective is to minimize the sum of the acquisition costs and the expected average completion time of the jobs. In contrast to previous models of this type, the second part of this objective function corresponds to a well-solvable scheduling problem that can be solved to optimality by a simple priority rule. A heuristic method to solve the entire problem is described, for which strong asymptotic optimality results can be established
    Original languageEnglish
    Pages (from-to)43-58
    JournalAnnals of Operations Research
    Volume1
    Issue number1
    DOIs
    Publication statusPublished - 1984

    Bibliographical note

    0671.90034

    UN SDGs

    This output contributes to the following UN Sustainable Development Goals (SDGs)

    1. SDG 16 - Peace, Justice and Strong Institutions
      SDG 16 Peace, Justice and Strong Institutions

    Fingerprint

    Dive into the research topics of 'A hierarchical scheduling problem with a well-solvable second stage'. Together they form a unique fingerprint.

    Cite this