Abstract
In the hierarchical scheduling model to be considered, the decision at the aggregate level to acquire a number of identical machines has to be based on probabilistic information about the jobs that have to be scheduled on these machines at the detailed level. The objective is to minimize the sum of the acquisition costs and the expected average completion time of the jobs. In contrast to previous models of this type, the second part of this objective function corresponds to a well-solvable scheduling problem that can be solved to optimality by a simple priority rule. A heuristic method to solve the entire problem is described, for which strong asymptotic optimality results can be established
| Original language | English |
|---|---|
| Pages (from-to) | 43-58 |
| Journal | Annals of Operations Research |
| Volume | 1 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 1984 |
Bibliographical note
0671.90034UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 16 Peace, Justice and Strong Institutions
Fingerprint
Dive into the research topics of 'A hierarchical scheduling problem with a well-solvable second stage'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver