TY - JOUR
T1 - An exact approach for cyclic inbound inventory routing in a level production system
AU - Bertazzi, Luca
AU - Laganà, Demetrio
AU - Ohlmann, Jeffrey W.
AU - Paradiso, Rosario
PY - 2020/6/16
Y1 - 2020/6/16
N2 - We study an inbound inventory routing problem concerned with the minimal-cost collection of distinct components from a network of suppliers and subsequent delivery to a manufacturing plant. We assume known and constant production of end products at the plant that generates a synchronized production of components at each supplier. The lean production philosophy motivates two distinctive features of our formulation. To facilitate standardized work, we consider inventory collection plans that are cyclic and repeatable into the near future. To support the notion of level production planning, we consider inventory collection plans such that the pickup amount at each supplier is a multiple of the daily demand and in exact proportion to the number of days since the last pickup. We study the polyhedron of the convex hull of our mathematical formulation and define new valid inequalities that we implement within our branch-and-cut algorithm for the problem. As our computational experiments confirm, our cyclic formulation is significantly more difficult to solve to optimality than the standard non-cyclic formulation. Regardless, our three-phase approach obtains competitive results for one-, two-, and three-vehicle instances over three- and six-period planning horizons.
AB - We study an inbound inventory routing problem concerned with the minimal-cost collection of distinct components from a network of suppliers and subsequent delivery to a manufacturing plant. We assume known and constant production of end products at the plant that generates a synchronized production of components at each supplier. The lean production philosophy motivates two distinctive features of our formulation. To facilitate standardized work, we consider inventory collection plans that are cyclic and repeatable into the near future. To support the notion of level production planning, we consider inventory collection plans such that the pickup amount at each supplier is a multiple of the daily demand and in exact proportion to the number of days since the last pickup. We study the polyhedron of the convex hull of our mathematical formulation and define new valid inequalities that we implement within our branch-and-cut algorithm for the problem. As our computational experiments confirm, our cyclic formulation is significantly more difficult to solve to optimality than the standard non-cyclic formulation. Regardless, our three-phase approach obtains competitive results for one-, two-, and three-vehicle instances over three- and six-period planning horizons.
KW - Branch-and-cut
KW - Cyclic planning horizon
KW - Inventory clearing policy
KW - Lean production
KW - Routing
UR - http://www.scopus.com/inward/record.url?scp=85077156306&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85077156306&partnerID=8YFLogxK
U2 - 10.1016/j.ejor.2019.11.060
DO - 10.1016/j.ejor.2019.11.060
M3 - Article
AN - SCOPUS:85077156306
SN - 0377-2217
VL - 283
SP - 915
EP - 928
JO - European Journal of Operational Research
JF - European Journal of Operational Research
IS - 3
ER -