TY - JOUR
T1 - Erratum to
T2 - Energy investment needs for fulfilling the Paris Agreement and achieving the Sustainable Development Goals (Nature Energy, (2018), 3, 7, (589-599), 10.1038/s41560-018-0179-z)
AU - McCollum, David L.
AU - Zhou, Wenji
AU - Bertram, Christoph
AU - de Boer, Harmen-Sytze
AU - Bosetti, Valentina
AU - Busch, Sebastian
AU - Després, Jacques
AU - Drouet, Laurent
AU - Emmerling, Johannes
AU - Fay, Marianne
AU - Fricko, Oliver
AU - Fujimori, Shinichiro
AU - Gidden, Matthew
AU - Harmsen, Mathijs
AU - Huppmann, Daniel
AU - Iyer, Gokul
AU - Krey, Volker
AU - Kriegler, Elmar
AU - Nicolas, Claire
AU - Pachauri, Shonali
AU - Parkinson, Simon
AU - Poblete-Cazenave, Miguel
AU - Rafaj, Peter
AU - Rao, Narasimha
AU - Rozenberg, Julie
AU - Schmitz, Andreas
AU - Schoepp, Wolfgang
AU - van Vuuren, Detlef
AU - Riahi, Keywan
PY - 2018/8/1
Y1 - 2018/8/1
N2 - In the version of ‘Supplementary Data 1’ originally published with this Article, the units for the ‘Capacity|Electricity|*’ variables in the ‘Non_Investment_Annual’ tab were incorrectly given as EJ/yr; they should have read GW. This has now been corrected. Also, some of the variables listed in the ‘Non_Investment_Variable_Defs’ were not required and have therefore been removed.
AB - In the version of ‘Supplementary Data 1’ originally published with this Article, the units for the ‘Capacity|Electricity|*’ variables in the ‘Non_Investment_Annual’ tab were incorrectly given as EJ/yr; they should have read GW. This has now been corrected. Also, some of the variables listed in the ‘Non_Investment_Variable_Defs’ were not required and have therefore been removed.
UR - http://www.scopus.com/inward/record.url?scp=85049506350&partnerID=8YFLogxK
U2 - 10.1038/s41560-018-0215-z
DO - 10.1038/s41560-018-0215-z
M3 - Erratum / Corrigendum
SN - 2058-7546
VL - 3
SP - 699
JO - Nature Energy
JF - Nature Energy
IS - 8
ER -